Do everything. Walls, lay new tile, replace the tub, toilet... new vanity. But it's a small bathroom, like 8x4 or whatever
With no electrical being rerouted or additional plumbing being installed I would estimate around 8 - 10KDo everything. Walls, lay new tile, replace the tub, toilet... new vanity. But it's a small bathroom, like 8x4 or whatever
no whey. Materials shouldn't be more than a grand. (not that I'm going for top of the line shite)With no electrical being rerouted or additional plumbing being installed I would estimate around 8 - 10K
What kind of trash materials/contractor are you using?With no electrical being rerouted or additional plumbing being installed I would estimate around 8 - 10K
Materials as in tub/surround, plumbing, fixtures, toilet, vanity, flooring, walls? Less than $1000? Good luck.no whey. Materials shouldn't be more than a grand. (not that I'm going for top of the line shite)
I haven't priced out a project like this forever. It's small ass bathroom. Vanity? 200 at Menards. Flooring? Again... a little patch of 4x5 at most. The tub insert... that's a better question. Only one patch of drywall probably. Feels like a bunch of 200ish dollar items. (around 1000)Materials as in tub/surround, plumbing, fixtures, toilet, vanity, flooring, walls? Less than $1000? Good luck.
Well a cheap tub and surround will be 700. If your current system is old, you'll need new plumbing and a plumber. You doing the work yourself?I haven't priced out a project like this forever. It's small ass bathroom. Vanity? 200 at Menards. Flooring? Again... a little patch of 4x5 at most. The tub insert... that's a better question. Only one patch of drywall probably. Feels like a bunch of 200ish dollar items. (around 1000)
Fook you. I'll do what I can if I hate the prices I am quoted. The tub, I'll admit, I was ignorant on.Well a cheap tub and surround will be 700. If your current system is old, you'll need new plumbing and a plumber. You doing the work yourself?
You'll hate the prices you're quoted with your expectations. Labor for 3-4 days will be 3-4k.Fook you. I'll do what I can if I hate the prices I am quoted. The tub, I'll admit, I was ignorant on.
Gross. So the tub is kind of dingy. But I suppose I could clean it up. Has a few stains. No cracks. Tub surround has a crack in it. Otherwise is ok. Figure it has to go.You'll hate the prices you're quoted with your expectations. Labor for 3-4 days will be 3-4k.
Now we have concrete proof you are delusional.no whey. Materials shouldn't be more than a grand. (not that I'm going for top of the line shite)
We paid about $16k three years ago in. Northern NJ. Tiled floor and walls, moved wall adding a couple of feet, floating sink/vanity and custom glass doors.Do everything. Walls, lay new tile, replace the tub, toilet... new vanity. But it's a small bathroom, like 8x4 or whatever
Anytime you do a bathroom, it'll start at $5000 and work up by what you pick out to go in. It's spendy for bathrooms larger than a half-bath. If it's a half-bath, then you can get away with about $2500 picking out really nice stuff.no whey. Materials shouldn't be more than a grand. (not that I'm going for top of the line shite)